Energy Policy WA sought public comment on a licence exemption application from Fortescue Metals Group Limited to operate existing and proposed generation works that will connect to the proposed Pilbara Energy Connection electricity transmission system.
The public consultation period closed on 13 August 2020. No submissions were received on the application. A copy of the licence exemption application can be found below.