Minister launches new Targeted Underground Power Program (TUPP)

News story
The Targeted Underground Power Program (TUPP) replaces the State Underground Power Program (SUPP) and continues its work of replacing existing overhead power lines in established residential areas with underground cabling.
Last updated:
Underground Power before and after shot. Electricity poles have been removed from a street that slops toward the ocean. The sun sets on the horizon, spilling its last rays into the vast ocean. Roofs dotted with solar panels.

The Targeted Underground Power Program (TUPP) was launched by the Minister for Energy on 7 November 2022 at Robinson Reserve in Tuart Hill. The TUPP will replace the State Underground Power Program (SUPP) and continue its work of replacing existing overhead power lines in established residential areas with underground cabling.

For more information

Targeted Underground Power Program

State Underground Power Program

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.

Send feedback