AEMO’s draft Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedure

The Australian Energy Market Operator (AEMO) has released a draft Certification of Reserve Capacity for the 2022 and a draft 2023 Reserve Capacity Cycles Wholesale Electricity Market (WEM) Procedure for consultation.
Last updated:

An outline of the Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedures was presented to the WRIG on 23 February 2023.  An outline of the Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedure was previously presented to the WRIG on 27 January 2022 and is available here.

AEMO has provided marked up copies of the draft Certification of Reserve Capacity for the 2022 and 2023 Reserve Capacity Cycles WEM Procedures to assist with identifying changes from previous versions.

The window for submitting feedback closed 19 May 2023A summary of submissions received on the Certification of Reserve Capacity for the 2023 Reserve Capacity Cycle WEM Procedure is provided below.