Draft Electric Storage Resource Obligation Intervals WEM Procedure

AEMO’s draft Electric Storage Resource Obligation Intervals WEM Procedure has now been released for consultation.
Last updated:

An outline of the Electric Storage Resource Obligation Intervals WEM Procedure was presented to the WRIG on 23 March 2023. 

An outline of this draft WEM Procedure was previously presented to the WEM Reform Implementation Group (WRIG) on 25 March 2021 and is available here.

AEMO has provided marked up copies of the Electric Storage Resource Obligation Intervals WEM Procedure to assist with identifying changes from previous versions. 

Stakeholders are invited to provide feedback on the draft WEM Procedure by 5:00pm (AWST) 19 May 2023 by submitting comments to wa.ets@aemo.com.au.  

AEMO request any feedback be submitted using AEMO’s Stakeholder WEM Procedure Submissions Template.