Since this web page was published, the Wholesale Electricity Market (WEM) Rules have been renamed the Electricity System and Market (ESM) Rules, and the Electricity Industry (Wholesale Electricity Market) Regulations 2004 (WEM Regulations) have been renamed the Electricity Industry (Electricity System and Market) Regulations 2004 (ESM Regulations). Changes have not been made to this web page to reflect this updated name.
At its first meeting, held on 28 February 2007, the Market Advisory Committee (MAC) agreed to establish a permanent Working Group to assist the Independent Market Operator (IMO) in considering, assessing and developing changes to the IMO WEM Procedures which the WEM Rules require the IMO to develop. The Working Group was to be summoned by the IMO when new procedures were developed or existing procedures needed to be modified. On 8 November 2017, the MAC disbanded the Working Group as it had been replaced by the AEMO Procedure Change Working Group.
Working Group members
|
Member |
Company |
Representing on the Working Group |
|
Kate Ryan |
Independent Market Operator |
Chair |
|
Fiona Wiseman |
Alinta Energy |
Industry Representative |
|
John Nguyen |
Perth Energy |
Industry Representative |
|
Steve Gould |
Community Electricity |
Industry Representative |
|
Adrian Theseira |
System Management |
System Management |
|
Brad Huppatz |
Synergy |
Synergy |
|
Erin Stone |
Independent Market Operator |
Independent Market Operator |
The Terms of Reference for the IMO Procedure Change and Development Working Group is available below