IMO Procedure Change and Development Working Group

An inactive working group of the Market Advisory Committee
Last updated:
Change of name from WEM Rules to ESM Rules

Since this web page was published, the Wholesale Electricity Market (WEM) Rules have been renamed the Electricity System and Market (ESM) Rules, and the Electricity Industry (Wholesale Electricity Market) Regulations 2004 (WEM Regulations) have been renamed the Electricity Industry (Electricity System and Market) Regulations 2004 (ESM Regulations). Changes have not been made to this web page to reflect this updated name.

At its first meeting, held on 28 February 2007, the Market Advisory Committee (MAC) agreed to establish a permanent Working Group to assist the Independent Market Operator (IMO) in considering, assessing and developing changes to the IMO WEM Procedures which the WEM Rules require the IMO to develop. The Working Group was to be summoned by the IMO when new procedures were developed or existing procedures needed to be modified. On 8 November 2017, the MAC disbanded the Working Group as it had been replaced by the AEMO Procedure Change Working Group.  

Working Group members

Member

Company

Representing on the Working Group

Kate Ryan

Independent Market Operator

Chair

Fiona Wiseman

Alinta Energy

Industry Representative

John Nguyen

Perth Energy

Industry Representative

Steve Gould

Community Electricity

Industry Representative

Adrian Theseira

System Management

System Management

Brad Huppatz

Synergy

Synergy

Erin Stone

Independent Market Operator

Independent Market Operator

The Terms of Reference for the IMO Procedure Change and Development Working Group is available below

 

Meeting Papers and Minutes

Meeting 11 (Cancelled)

Meeting 18 (22 April 2015)

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.

Send feedback