Rule Change: RC_2018_03

An active Rule Change Proposal made by Collgar Wind Farm on 1 March 2018.
Last updated:

Type: Standard Rule Change Process

Submitter: Collgar Wind Farm

Title: Capacity Credit Allocation Methodology for Intermittent Generators

Market Rules Affected: 10.5.1, 11, Appendix 9

Date Submitted: 1 March 2018

Current Status: Closed.

Event Date Comments
Notification Published 07/03/2018  
First Submission Period 07/03/2018– 20/04/2018 The submission period is at least 30 B-Days from the publication of the Rule Change Notice.
Draft Rule Change Report Published 30/06/2023 The timeframe for publishing the Draft Rule Change Report was extended in accordance with the Extension Notice published on 31 December 2022.
Second Submission Period

30/06/2023 - 28/07/2023

The submission period is at least 20 B-Days from the publication of the Draft Report.
Final Rule Change Report Published 15/08/2023 The Final Rule Change Report must be published within 20 B-Days after the end of the second submission period. The Coordinator rejected the Rule Change Proposal.
Commencement Not Applicable The Coordinator rejected the Rule Change Proposal.