AEMO’s draft Verification of Dispatch Inflexibility WEM Procedure and draft Meter Data Submissions WEM Procedure

Policy
Australian Energy Market Operator (AEMO) has released a draft Verification of Dispatch Inflexibility WEM Procedure and draft Meter Data Submissions WEM Procedure
Last updated:

The Australian Energy Market Operator (AEMO) has released a draft Verification of Dispatch Inflexibility Wholesale Energy Market (WEM) Procedure and draft Meter Data Submissions WEM Procedure for consultation.  

An outline of the Verification of Dispatch Inflexibility WEM Procedure was presented to the WRIG on 9 February 2023. An Outline of the Meter Data Submissions WEM Procedure was presented to the WRIG on 6 April 2023. 

 Stakeholders are invited to provide feedback on the draft WEM Procedures by 5:00pm (AWST) 18 July 2023 by submitting comments to wa.ets@aemo.com.au.  

AEMO request any feedback be submitted using AEMO’s Stakeholder WEM Procedure Submissions Template. 

You can download AEMO’s draft WEM Procedures and AEMO’s Stakeholder WEM Procedure Submissions Template from the link below.