When this guidance applies
This approach is suitable when all of the following apply:
- the only change is to the wall construction system (for example, cavity brick to brick veneer)
- the owner agrees to the change rather than delaying the project until bricks are available. and
- the change does not affect any planning approval or other local government requirements that apply to the property.
If the change goes beyond the wall system, or if you are unsure whether planning approval is affected (for example, because the outside appearance of the home will change), contact your local government before going ahead.
Why the change needs approval
A building permit approves a specific building design. Changing the wall system can affect whether the building still meets the applicable building standards. This includes but is not limited to structural adequacy, roof tie downs, energy efficiency, fire safety and termite management. A registered building surveyor needs to confirm that the new design complies.
At the end of the job, the builder must sign and lodge a notice of completion (BA7). This confirms the work was completed in relation to the building permit. If the walls were changed without approval, the builder cannot properly sign this notice. This can create legal and liability risks for the builder, the owner and others involved.
The Building Act 2011 does not set out a specific process for amending a building permit that has already been granted. As a result, local governments may record these changes in slightly different ways, depending on their processes and systems. The steps below set out an approach that should work in most cases.
What builders need to do
Show moreStep 1 – Agree the change with the owner in writing
Agree the change and any price adjustment with the owner as a written variation to the building contract. Do this before any work on the changed walls starts. The agreed variation price will be needed for the permit application.
Step 2 – Get a new certificate of design compliance
Obtain a new certificate of design compliance (CDC) from a registered building surveyor confirming that the changed design meets the building standards:
- for an uncertified application, this is issued by the local government’s building surveyor
- for a certified application, this is issued by your private building surveyor.
The building surveyor may charge for assessing the changes and issuing the new CDC.
Step 3 – Lodge the change with the local government
Submit the following to the relevant local government:
- appropriate form required by the local government that captures relevant information to clearly identify:
- the property to which the changes relates to
- building works details (that the wall construction is changing and what it is changing to)
- owner’s details
- builder’s details
- the agreed contract variation and its price; and
- the new certificate of design compliance (CDC) accompanied with amended plans and specifications, with the changed wall construction clearly marked and listed.
- check the Home Indemnity Insurance is still appropriate. Provide proof of cover when required.
Contact the relevant local government early to check whether it has any specific requirements
What local governments should do
Show moreRecord the change
The changed work should be documented as a separate approval, generally by granting a further building permit for the changed work that sits alongside the existing permit.
How this is recorded will depend on the local government’s systems. Some systems allow the change to be linked to, or recorded against, the existing permit. Others will need a new permit number. Either approach is acceptable, provided the change is clearly approved and on the record.
Fees and levies
Where the application relates only to the changed walls, any fees and levies applied should be based on the value of the change only, as shown in the written contract variation. They should not be based on the value of the whole project.
Changing from brick cavity to another wall system is unlikely to change the value of the work by much. In most cases, approving this limited change should attract no more than the minimum fee or levy.
Processing
Local governments are encouraged to use their normal building permit processes for these changes and to be practical and flexible. The aim is to keep delays and disruption to a minimum while making sure the change is properly documented and meets all building requirements.
Information for homeowners
Show more- Your builder should not change the type of walls without your written agreement. Any change, including any change in price to the home building work contract, should be set out in a written variation to your contract.
- Before the new walls are built, the change must be checked by a building surveyor and approved by your local government.
- Ask your builder to confirm that the change has been approved. Keep a copy of your building permit documents.
- If you have questions about how a change could affect your home, talk to your builder or your local government.