2026 Benchmark Technology Review

The Coordinator of Energy has reviewed the Benchmark Technologies to be used in setting the Benchmark Reserve Capacity Prices (BRCPs).
Last updated:

The Coordinator of Energy (Coordinator) has reviewed the Benchmark Technologies to be used in determining the Peak and Flexible Benchmark Reserve Capacity Prices (BRCPs).  

The Coordinator must determine the Benchmark Technologies within six months of a revised Electricity Storage Resource Duration Requirement (ESRDR) being published in AEMO’s Electricity Statement of Opportunities (ESOO).   

AEMO’s 2026 ESOO was published on 23 June and included an ESRDR of 7 hours, an increase from the previous ESRDR of 6 hours.   

The review included determination of: 

  • The Benchmark Peak Technology 
  • The Benchmark Flexible Technology. 

The following was assessed for both:   

  • Determining which technology represents the lowest annual capital cost and annual fixed operating and maintenance costs 
  • Whether gross costs of new entry (CONE) or net CONE should apply.  

This Review was conducted in consultation with the Market Advisory Committee’s WEM Investment Certainty Review Working Group. 

On 9 September 2026, the Coordinator of Energy published his Draft Determination for consultation, available below. It includes the Benchmark Peak Technology and Benchmark Flexible Technology as well as the CONE approach to be applied. The consultation period closed on 7 October 2026.

On 20 November 2026, the Coordinator published the 2026 Determination of the Benchmark Technologies.

In summary, the Coordinator has determined that: 

  1. The Benchmark Peak Technology and Benchmark Flexible Technology will be E-Class Simple Cycle Gas Turbines with:

    • a two-unit dual-fuel configuration;
    • two electrical connections to the transmission network, limiting the maximum single contingency to approx. 180 MW;
    • a dual-fuel operating model, certified on liquid fuel in the Reserve Capacity Mechanism but with a preference to run on gas fuel when practical;
    • 42 hours of onsite liquid fuel storage;
    • connection to the Dampier to Bunbury Natural Gas Pipeline (DBNGP);
    • DBNGP capacity reservation equal to 25% of the Facility’s daily gas consumption when operating at full capacity; and
    • an unconstrained location near a 330kV node on the Clean Energy Link North.
  2. Benchmark Reserve Capacity Prices will be determined on a gross Cost of New Entry basis. 

Following the 2026 Benchmark Technology Determination, the Coordinator will consult on and amend the BRCP Whole Electricity Market (WEM) Procedure, and then determine and publish the BRCPs for the 2027 Reserve Capacity Cycle by 16 March 2027.

Draft determination Submissions

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.