Pipeline Impact Agreement Framework

Pipeline Impact Agreements help manage the introduction of broader specification gas into designated transmission pipelines, balancing flexibility for new gas supplies with protections for pipeline operators and users.
Last updated:

The  Gas Supply (Gas Quality Specifications) Act 2009 (the Act) recognises that some gas transmission pipelines in Western Australia may be particularly sensitive to changes in gas quality because they are fully utilised or operating close to capacity. 

The Minister for Energy may declare these pipelines to be a Pipeline Impact Agreement (PIA) pipeline. WA currently has two PIA pipelines:   

Pipeline Impact Agreements 

Gas producers that want to deliver gas into the Dampier to Bunbury Natural Gas Pipeline or the Goldfields Gas Pipeline that is outside their reference specifications will need to enter into a Pipeline Impact Agreement with the pipeline operator.  

The purpose of a PIA is to ensure the pipeline operator is not disadvantaged by the introduction of broader specification gas. The agreement identifies the impacts of the proposed gas supply and sets out how those impacts will be addressed.

A PIA does not take effect until 18 months after agreement is entered into, giving pipeline users time to prepare for any change in gas specification and protecting the pipeline operator from adverse consequences. 

Standard Form Pipeline Impact Agreements 

The gas quality framework provides for default or “fall back” PIAs which a gas producer may elect to use if it cannot agree with a pipeline operator on the terms of a PIA.  

The standard form warehousing method PIA for the Dampier to Bunbury Natural Gas Pipeline is available here: Pipeline Impact Agreement (standard form).

Existing Pipeline Impact Agreements 

PipelineGas producer Gas field(s) or production facilityDate PIA entered into 
Dampier to Bunbury Natural Gas PipelineWoodside Burrup Pty Ltd (Pluto) and Woodside Energy Ltd (Scarborough)Pluto and Scarborough 2 July 2025
Dampier to Bunbury Natural Gas PipelineWoodside Energy (Australia) Pty Ltd and Santos WA PVG Pty LtdMacedon 25 June 2021
Dampier to Bunbury Natural Gas PipelineMEPAU Perth Basin Pty Ltd Xyris Production Facility 1 July 2020
Dampier to Bunbury Natural Gas PipelineWoodside Burrup Pty LtdPluto 12 June 2020
Dampier to Bunbury Natural Gas PipelineBHP Billiton Petroleum (Australia) Pty Ltd and Apache PVG Pty LtdMacedon1 September 2011

When gas producers enter a PIA, they must provide summary information about the PIA to the Australian Energy Market Operator (AEMO) within 20 business days. The information to be included in the summary (known as PIA Summary Information) is set out in section (7)(1)(a),(b),(c) and (d) of the Act. 

PIA Summary Information for existing Pipeline Impact Agreements are available on the WA Gas Bulletin Board, here: Gas Bulletin Board (WA)

Exemptions

The Minister for Energy may shorten the 18-month period before a PIA takes effect if they are satisfied that it will not materially affect operators of PIA pipelines, operators of other transmission and distribution pipelines, gas storage facilities, or gas consumers. 

To date, the Minister has approved shortening the 18-month period for two PIA:  

PipelineGas producerGas field(s)Date exemption granted
Dampier to Bunbury Natural Gas PipelineWoodside Burrup Pty Ltd (Pluto) and Woodside Energy Ltd (Scarborough)Pluto and Scarborough 10 September 2026
Dampier to Bunbury Natural Gas PipelineWoodside Burrup Pty LtdPluto30 April 2020

PIA pipeline higher heating values 

PIA pipeline operators have been required to provide the daily average higher heating value (HHV) of the gas stream for publication on the WA Gas Bulletin Board since its commencement in August 2013.  

Prior to that time, the information was published separately by the Public Utilities Office. 

For the average HVVs of PIA pipelines from 1 August 2013 to today, see: Gas Bulletin Board (WA) 

The average HHVs from 1 January 2013 to 31 July 2013 are available here: 

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.

Send feedback