Type: Standard Rule Change Process
Submitter: IMO
Title: Demand Side Management – Operational Issues
Market Rules Affected: 2.29.5, 2.29.8A, 2.29.8B, 2.29.9A, 2.29.9B, 2.29.9C, 4.8.3, 4.10.1, 4.11.1, 4.11.4, 4.11.4A, 4.12.8, 4.14.1, 4.25.1, 4.25.2, 4.25.3B, 4.25.4, 4.25.4E, 4.25.4F, 4.25.9, 4.25A.1, 4.25A.2, 4.25A.3, 4.25A.4, 4.25A.5, 4.26.1, 4.26.1C, 4.26.2, 4.26.2C, 4.26.2D
Date Submitted: 17 July 2008
Date First Published on the IMO Website: 18 July 2008
Date Final Report Published: 24 November 2008
Current Status: The final set of Amending Rules commenced at 8.00am on 1 October 2011. The commencement table below shows the commencement date of each Amending Rule
| Event | Date | Comments |
|---|---|---|
| Notification Published | 18/07/2008 | |
| First Submission period | 18/07/2008 – 29/08/2008 | The submission period is 6 weeks from the date the IMO published the notification |
| Draft Report published | 26/09/2008 | Must be published within 20 B-Days after the end of the submission period |
| Second submission period | 27/09/2008 – 27/10/2008 | The submission period is 20 B-Days from the date the IMO published the Draft Report |
| Final Report Published | 24/11/2008 | Must be published within 20 B-Days after the end of the second submission period |
| Rule Commencement | 01/03/2009 (8:00am) 01/10/2009 (8:00am) 01/10/2010 (8:00am) 01/10/2011 (8:00am) |
Submissions received during the first submission period
Submissions received during the second submission period
Amending Rules Commencement Dates
| Rule Number | Subject | Commencement Date | Commencement Notice |
|---|---|---|---|
| 2.29.5 | Include new clause 2.28.8A | 1 March 2009 | 1 |
| 2.29.8A | Interval Meters required. | 1 March 2009 | 1 |
| 2.29.8B | Verification Test required within 20 days of certification. | 1 October 2010 | 3 |
| 2.29.9A | Minimum activation notice of 4 hours. | 1 March 2009 | 1 |
| 2.29.9B | Ability to increase activation time up to 4 hours. | 1 March 2009 | 1 |
| 2.29.9C | Can’t extend minimum activation time beyond 4 hours. | 1 March 2009 | 1 |
| 4.8.3 | Loads must have same availability as DSM program | 1 March 2009 | 1 |
| 4.10.1 | DSM to be available noon to 8 pm. | 1 March 2009 | 1 |
| 4.11.1 | Certification precision to be 0.001 MW | 1 March 2009 | 1 |
| 4.11.4 | DSM cannot be Availability Class 1 | 1 March 2009 | 1 |
| 4.11.4A | Capacity of DSM to be determined by its Relevant Demand | 1 March 2009 | 1 |
| 4.12.8 | Obligation drops to zero after two days of dispatch at maximum | 1 March 2009 | 1 |
| 4.14.1 | Capacity precision to be 0.001 MW | 1 March 2009 | 1 |
| 4.25.1 | DSM verification only to apply to period between October and March | 1 October 2010 | 3 |
| 4.25.2 | DSM verification testing to require load reduction for one Trading Interval | 1 October 2010 | 3 |
| 4.25.3B | Activation of DSM deemed to be a Reserve Capacity Test | 1 October 2010 | 3 |
| 4.25.4 | Reserve Capacity testing | 1 October 2010 | 3 |
| 4.25.4E | Capacity Payments to be refunded if capacity credits surrendered to IMO | 1 March 2009 | 1 |
| 4.25.4F | Capacity cannot offer supplementary reserve capacity in the year that capacity credits are surrendered | 1 March 2009 | 1 |
| 4.25.9 | System Management testing of Loads | 1 October 2010 | 3 |
| 4.25A.1 | Verification test | 1 October 2010 | 3 |
| 4.25A.2 | Verification test | 1 October 2010 | 3 |
| 4.25A.3 | Verification test | 1 October 2010 | 3 |
| 4.25A.4 | Verification test | 1 October 2010 | 3 |
| 4.25A.5 | Verification test | 1 October 2010 | 3 |
| 4.26.1 | Refunds | 1 October 2009 | 2 |
| 4.26.1C | Refunds | 1 October 2009 | 2 |
| 4.26.2 | Refunds | 1 October 2009 | 2 |
| 4.26.2C | Determination of Relevant Demand | 1 March 2009 | 1 |
| 4.26.2D | Determination of capacity shortfall | 1 October 2009 | 2 |
| 4.26.2E | Calculation of refund | 1 October 2009 | 2 |
| 4.26.3 | Calculation of refund | 1 October 2009 | 2 |
| 4.26.3A | Calculation of refund | 1 October 2009 | 2 |
| 6.17.6 | Calculation of Dispatch Payment | 1 October 2011 | 4 |
| 7.7.5D | Remove clause determining quantity | 1 October 2011 | 4 |
| 7.7.10 | Cancellation of dispatch instructions | 1 March 2009 | 1 |
| 7.13.1 | Additional data to be provided by System Management to be used in settlement | 1 March 2009 | 1 |