Rule Change: RC_2014_05

An active Rule Change Proposal Made by the Independent Market Operator on 2 December 2014.
Last updated:

Type: Standard Rule Change Proposal

Submitter: IMO

Title: Reduced Frequency of the Review of the Energy Price Limits and the Maximum Reserve Capacity Price

Market Rules Affected: Clauses 1.13.1 (new), 1.13.2 (new), 1.13.3 (new), 1.13.4 (new), 1.13.5 (new), 1.13.6 (new), 1.13.7 (new), 1.14.1 (new), 1.14.2, (new), 1.14.3 (new), 1.14.4 (new), 1.14.5 (new), 1.14.6, (new), 1.14.7 (new), 1.14.8 (new), 1.14.9 (new), 2.8.13, 2.26.3, 4.1.19, 4.16.1, 4.16.2, 4.16.3, 4.16.4, 4.16.5, 4.16.6, 4.16.7, 4.16.8, 4.16.9, 4.16.10 (new), 4.16.11 (new), 4.16.12 (new), 4.16.13 (new), 4.16.14 (new), 4.16.15 (new), 6.6.2A, 6.6.5, 6.6.8, 6.6.10, 6.9.5, 6.9.6, 6.20.1, 6.20.2, 6.20.3, 6.20.4, 6.20.5, 6.20.6, 6.20.7. 6.20.8, 6.20.9, 6.20.9A, 6.20.10, 6.20.11, 7A.2.3, 7A.2.9, 7A.3.5, 10.5.1, the Glossary and Appendix 6.

Date Submitted: 02 December 2014

Current Status: Closed.

Event Date Comments
Notification Published 02/12/2014  
First Submission Period 03/12/2014 - 02/02/2015 The submission period has been extended to 40 B-Days from the date the IMO published the Rule Change Notice.
Draft Report Published 30/06/2023 The timeframe for publishing the Draft Rule Change Report was extended in accordance with the Extension Notice published on 31 December 2021.
Second Submission Period 30/06/2023 - 28/07/2023 The submission period is at least 20 B-Days from the date the Rule Change Panel published the Draft Report.
Final Report Published 15/08/2023 Must be published within 20 B-Days after the end of the second submission period.
Ministerial Approval Not Applicable  The Coordinator rejected the Rule Change Proposal.
Commencement Not Applicable The Coordinator rejected the Rule Change Proposal.

 

Submissions received out of session

Submissions received during the second submission period