Rule Change: RC_2015_01

A Rule Change Proposal made by the Independent Market Operator on 3 March 2015
Last updated:

Type: Standard Rule Change Proposal

Submitter: IMO

Title: Removal of Market Operation Market Procedures

Market Rules Affected: Clauses 1.14.1, 1.16.1, 1.17.1, 1.18.2, 2.2.2, 2.9.2D (new), 2.9.2E (new), 2.9.5, 2.11.1, 2.11.2, 2.13.2, 2.13.3, 2.13.6A, 2.13.6K, 2.13.9C, 2.15.1, 2.15.2, 2.15.3, 2.15.6A, 2.15.6B, 2.15.6C, 2.15.7, 2.27.6, 2.27.10, 2.27.15, 2.27.17, 2.30.11, 2.30A.6, 2.31.23, 2.35.4, 2.36.5, 2.36A.1, 2.36A.2, 2.36A.5, 2.37.8, 2.43.1, 3.2.2, 3.2.4, 3.2.6, 3.2.8, 3.3.3, 3.4.9, 3.5.11, 3.11.4, 3.11.15, 3.16.4, 3.16.7, 3.16.8A, 3.16.10, 3.17.10, 3.18.3, 3.18.15, 3.18.21, 3.19.10, 3.19.14, 3.21.12, 3.21A.15, 3.21B.5, 3.21B.8, 4.5.14, 4.5.14B, 4.5.15, 4.5.16, 4.5.17, 4.9.10, 4.13.8, 4.14.11, 4.17.9, 4.24.18, 4.25.14, 4.25A.1, 4.27.12, 4.28A.3, 4.28B.9, 4.28C.15, 6.17.6F, 6.19.6, 6.19.10, 7.2.5, 7.6.13, 7.6A.7, 7.6A.8, 7.6A.10, 7.7.4A, 7.7.5A, 7.7.5B, 7.7.6, 7.9.19, 7.10.4, 7.13.1, 7.13.3, 7A.1.6, 7A.3.1, 7A.3.2, 7A.3.3, 7A.3.4, 7A.3.7, 7A.3.7A, 7A.3.15, 7B.1.2, 7B.1.4, 7B.3.2, 8.6.2, 9.2.1, 9.4.18, 9.20.1, 10.2.7, headings 2.15, 2.43 and 9.2, Chapter 11 (Glossary), and Appendix 9.

Date Submitted: 3 March 2015

Current Status: The Amending Rules commenced on 1 August 2019

Event Date Comments
Notification Published 03/03/2015  
First Submission Period 04/03/2015 - 16/04/2015 The submission period is at least 30 B-Days from the date the IMO published the Rule Change Notice.
Further Submission Period  23/10/2018 – 09/11/2018  A call for further submissions was published on 22 October 2018. 
Draft Report Published 15/03/2019 The timeframe for publishing the Draft Rule Change Report was further extended in accordance with the Extension Notice published on 17 December 2018.
Second Submission Period 15/03/2019 – 12/04/2019 The submission period is at least 20 B-Days from the date the Rule Change Panel published the Draft Rule Change Report.
Final Report Published 15/05/2019 Must be published within 20 B-Days after the end of the second submission period.
Ministerial Approval 10/06/2019  
Commencement 01/08/2019