Draft Muchea Industrial Park structure plan

Plan
This draft Structure Plan updates the 2011 Muchea Employment Node Structure Plan and provides for the area's future industrial development.

Read the media statement

The Muchea Industrial Park is a developing 1167-hectare industrial estate in the Shire of Chittering about 50 kilometres north-east of the Perth CBD. It is strategically located at the junction of key arterial roads including NorthLink, Great Northern Highway and Brand Highway . It is positioned to be a key economic and employment generator and the closest industrial area to Perth with access by triple road trains (RAV10 vehicles) which is likely to attract freight and logistics activities.

Submissions

The draft Muchea Industrial Park Structure Plan closed for public comment on 05 February 2021.

The feedback is being reviewed and modifications to the plan to address feedback are being drafted to present the draft structure plan to the WAPC for final approval by the end of the year.

Muchea Employment Node structure plan (2011)

Muchea employment node structure plan (PDF 4 MB)

The Muchea Employment Node structure plan is the existing plan adopted by the WAPC in 2011, which is subject to the above draft update.

Documents

Draft Muchea Industrial Park structure plan information brochure
Muchea Industrial Park land demand and economic assessment
Page reviewed 10 September 2021