Warren-Donnelly surface water allocation plan: for public comment

Plan
This plan was open for public comment from June to September 2010
Last updated:

We sought public comment on this plan, which set out the allocation of surface water in the Warren-Donnelly area.

Please download the document below.

Have a question or want to report a problem?

Fill in the form to get assistance or tell us about a problem with this information or service.

Send feedback