Gingin surface water allocation plan 2011

Plan
The plan sets out our approach for managing surface water resources and provides allocation limits
Last updated:

The plan details our approach to managing surface water resources in the Gingin area, provides allocation limits and describes how we will:

  • recover water by recouping unused entitlements to within the allocation limits
  • allocate and license surface water if water becomes available (including through trades)
  • manage the effect of upstream abstraction on downstream reliability
  • maintain surface water flow to minimise the risk to other users and environmental values
  • evaluate the performance of the plan against its objectives.

Please download the document below.