Not Progressed

A list of Rule Change Proposals that did not progress to completion of the rule change process.
ID Date Submitted Title Submitted by
RC_2011_03 28/02/2011 Modification to over Capacity Credit Allocation Submission penalty Synergy
RC_2009_42 17/12/2009 Calculation of Net STEM Shortfall Griffin Energy
RC_2009_38 29/10/2009 Provision of Load Following Ancillary Service System Management

 

Rejected

A list of Rule Change Proposals that were rejected.
ID Date submitted Title Submitted by Date rejected
RC_2019_01 21/06/2019 The Relevant Demand calculation Enel X 9/11/2023
RC_2019_03 17/12/2020 Method used for the assignment of Certified Reserve Capacity to Intermittent Generators Economic Regulation Authority 21/09/2023

RC_2014_05

 

2/12/2014 Reduced Frequency of the Review of the Energy Price Limits and the Maximum Reserve Capacity Price Independent Market Operator 15/08/2023

RC_2018_03

01/03/2018 Capacity Credit Allocation Methodology for Intermittent Generators. Collgar Wind Farm 15/08/2023
RC_2014_09 13/03/2015 Managing Market Information Independent Market Operator 13/12/2019
RC_2014_10 13/01/2015 Provision of Network Information to System Management Independent Market Operator 28/06/2018
RC_2014_02 14/07/2014 Removal of Facility Aggregation Independent Market Operator 10/12/2014
RC_2013_20 10/01/2014 Changes to the Reserve Capacity Price and the Dynamic Reserve Capacity Refund Regime Independent Market Operator 13/05/2015
RC_2013_10 21/08/2013 Harminisation of Supply-Side and Demand-Side Capacity Resources Independent Market Operator 19/05/2014
RC_2013_09 18/06/2013 Incentives to Improve Availability of Scheduled Generators Independent Market Operator 19/05/2014
RC_2012_10 14/06/2012 Limits to Early Entry Capacity Payments Synergy 03/09/2013
RC_2012_02 23/08/2012 Relevant Demand of a Demand Side Program EnerNOC 18/07/2013
RC_2011_09 15/05/2012 Prudential Requirements Independent Market Operator 19/11/2012
RC_2010_37 30/11/2010 Calculation of the Capacity Value of Intermittent Generation - Methodology 2 (Griffin Energy) Griffin Energy 20/12/2011
RC_2009_33 21/10/2009 Provision of Information to the Independent Market Operator System Management 19/03/2010
RC_2008_35 14/11/2008 Capacity Refund Mechanism - New Generators Griffin Energy 22/05/2009
RC_2008_34 02/10/2008 Funding of SRC in the Event of Capacity Credit Cancellation Independent Market Operator 26/06/2009
RC_2008_31 15/12/2008 Capacity Credits for Solar Facilities Synergy 22/05/2009

 

Amending Rules by the Minister since 2015

A list of rule changes made by the Minister for Energy under regulation 7(5) of the Electricity Industry (Wholesale Electricity Market) Regulations 2004.
GazetteGazettal dateNameCommencement Date(s)
2023/16512/12/2023Wholesale Electricity Market Amendment (Reserve Capacity Reform) Rules 2023

Schedule 1 - 13/12/2023 (8.00am) 

Schedule 2, 3 and 4 - At a time specified by the Minister in a notice published in the Gazette.

2023/14503/11/2023

Wholesale Electricity Market Amendment (FCESS Shortfall Pricing) Rules 2023

03/11/2023 (8:00am)

 2023/125

19/09/2023Wholesale Electricity Market Amendment (Market Suspension) Rules 2023 01/10/2023 (8:00am)
 2023/12519/09/2023Wholesale Electricity Market Amendment (Tranche 7 Amendments) Rules 2023 01/10/2023 (8:00am)
2023/9618/07/2023Wholesale Electricity Market Amendment (Supplementary Capacity No. 2) Rules 2023Schedule A - 22/07/2023 (8:00am)  
Schedule B - 01/04/2024 (8:00am)
2023/4828/04/2023Wholesale Electricity Market Amendment (Supplementary Capacity) Rules 2023Schedule A - 29/04/2023 (8:00am)
Schedule B - 01/07/2023 (8:00am)
Schedule C - At a time specified by the Minister in a notice published in the Gazette
 
2023/3731/03/2023Wholesale Electricity Market Amendment (Tranche 6A Amendments) Rules 2023 

Schedule A - 17/04/2023 (8:00am)

Schedule B - At a time specified by the Minister in a notice published in the Gazette.

Confirmed commencement date:

  • 01/10/2023 (8:00am) - Gazette 2023/125
2022/18420/12/2022Wholesale Electricity Market Amendment (Tranche 6 Amendments) Rules 2022

Schedule A - 01/01/2023 (8:00am)
Schedule B - 01/02/2023 (8:00am)
Schedule C - 01/03/2023 (8:00am)
Schedule D - 17/04/2023 (8:00am)
Schedule E - At a time specified by the Minister in a notice published in the Gazette.

Confirmed commencement date:

  • 01/10/2023 (8:00am) - Gazette 2023/125
2022/6717/05/2022Wholesale Electricity Market Amendment (Network Access Quantities Procedure) Rules 2022

Schedule A - 01/09/2022 (8:00am)

Schedule B - 01/03/2023 (08:00am)

2021/21217/12/2021Wholesale Electricity Market Amendment (Tranche 5 Amendments) Rules 2021

Schedule A - 18/12/2021 (8:00am)
Schedule B - 01/02/2022 (8:00am)
Schedule C - 01/03/2022 (8:00am)
Schedule D - 12/04/2022 (8:00am)
Schedule E - 01/07/2022 (8:00am)
Schedule F - 01/09/2022 (8:00am)
Schedule G - 01/01/2023 (8:00am)
Schedule H - 01/10/2023 (8:00am)
Schedule I - At a time specified by the Minister in a notice published in the Gazette.

Confirmed commencement dates include:

  • 01/01/2023 (8:00am) - Gazette 2022/184
  • 01/10/2023 (8:00am) - Gazette 2023/125
2021/18329/10/2021Wholesale Electricity Market Amendment (Transitional Provisions) Rules 202130/10/2021 (8:00am)
2021/16628/09/2021Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 2) Rules 2021

Schedule A - Immediately after the commencement of:

  • the Amending Rules in the Wholesale Electricity Market Amendment (Reserve Capacity Pricing Reforms) Rules 2019, that commence at 8:00am on 01/10/2021;
  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranche 1 Amendments) Rules 2020, that commence at 8:00am on 01/10/2021;
  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 2 of the commencement notice dated 24/05/2021, that commence at 8:00am on 01/10/2021; and
  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 1) Rules 2021, that commence at 8:00am on 01/10/2021

Schedule B - Immediately after the commencement of:

  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 3 of the commencement notice dated 24/05/2021, that commence at 8:00am on 01/11/2021; and
  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 2 of the commencement notice dated 24/09/2021, that commence at 8:00am on 01/11/2021

Schedule C - 01/12/2021 (8:00am)
Schedule D - Immediately after the commencement of:

  • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 4 of the commencement notice dated 24/05/2021, that commence at 8:00am on 01/03/2022; and
  • the Amending Rules in Schedule D of the Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 1) Rules 2021, that commence at 8:00am on 01/03/2022

Schedule E - 01/06/2022 (8:00am)
Schedule F - 01/07/2022 (8:00am)
Schedule G - At a time specified by the Minister in a notice published in the Gazette
Confirmed commencement dates include:

  • 01/07/2022 (8:00am) - Gazette 2021/212
  • 01/10/2023 (8:00am) - Gazette 2023/125
2021/9628/05/2021Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 1) Rules 2021

Schedule A - Immediately after the commencement of:

  • the Amending Rules in Schedule B of the Wholesale Electricity Market Amendment (Governance) Rules 2021, that commence at 8:00am on 01/07/2021; and
  • the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 2 of the commencement notice dated 25/01/2021, and Part 1 of the commencement notice dated 24/05/2021, that commence at 8:00am on 01/07/2021

Schedule B - 01/08/2021 (8:00am)

Schedule C - Immediately after the commencement of:

  • the Amending Rules in the Wholesale Electricity Market Amendment (Reserve Capacity Pricing Reforms) Rules 2019, that commence at 8:00am on 01/10/2021; and
  • the Amending Rules set out in Schedule C of the Wholesale Electricity Market Amendment (Tranche 1 Amendments) Rules 2020, that commence at 8:00am on 01/10/2021

Schedule D - Immediately after the commencement of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 4 of the commencement notice dated 24/05/2021, that commence at 8:00am on 01/03/2022

Schedule E - At a time specified by the Minister in a notice published in the Gazette.

Confirmed commencement dates include:

  • 01/03/2022 (8:00am) - Gazette 2021/166
  • 01/07/2022 (8:00am) - Gazette 2021/166
  • 01/10/2023 (8:00am) - Gazette 2023/125
2021/1722/01/2021Wholesale Electricity Market Amendment (Governance) Rules 2021

Schedule A - 01/02/2021 (8:00am)

Schedule B - 01/07/2021 (8:00am)

Schedule C - Immediately after commencement of the Amending Rules in clauses 50 and 62 of Schedule C of the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 on 01/10/2023 (8:00am)

2020/21424/12/2020Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020

Schedule A - 01/01/2021 (8:00am)

Schedule B - 01/02/2021 (8:00am)

Schedule C - Provisions to commence at the times specified by the Minister in notices published in the Gazette. Confirmed commencement dates include:

  • 01/02/2021 (8:00am) - Gazette 2021/20
  • 01/07/2021 (8:00am) - Gazette 2021/20
  • Immediately after commencement of:
    • the Amending Rules in Schedule B of the Wholesale Electricity Market Amendment (Governance) Rules 2021, that commence at 8:00 am on 01/07/2021; and
    • the Wholesale Electricity Market Amendment (Tranches 2 and 3 Amendments) Rules 2020 specified in Part 2 of the commencement notice dated 25/01/2021 - Gazette 2021/96
  • Immediately after commencement of the Amending Rules in the Wholesale Electricity Market Amendment (Reserve Capacity Pricing Reforms) Rules 2019 that commence at 8:00am on  01/10/2021 - Gazette 2021/96
  • Immediately after the commencement of:
    • the Amending Rules in the Wholesale Electricity Market Amendment (Reserve Capacity Pricing Reforms) Rules 2019, that commence at 8:00am on 01/10/2021;
    • the Amending Rules in Schedule C of the Wholesale Electricity Market Amendment (Tranche 1 Amendments) Rules 2020, that commence at 8:00am on 01/10/2021; and
    • the Amending Rules set out in Schedule C of the Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 1) Rules 2021, that commence at 8:00am on 01/10/2021 – Gazette 2021/166
  • 01/11/2021 (8:00am) - Gazette 2021/96 and Gazette 2021/166
  • 18/12/2021 (8:00am) – Gazette 2021/212
  • 01/03/2022 (8:00am) - Gazette 2021/96 and Gazette 2021/212
  • Immediately after the commencement of the Amending Rules in Schedule D of the Wholesale Electricity Market Amendment (Miscellaneous Amendments No. 1) Rules 2021, that commence at 8:00am on 01/03/2022 – Gazette 2021/166
  • 12/04/2022 – Gazette 2021/212
  • 01/09/2022 (8:00am) – Gazette 2021/166 and Gazette 2021/212
  • 06/12/2022 (8:00am) – Gazette 2021/166
  • 01/01/2023 (8:00am) - Gazette 2022/184
  • 01/10/2023 (8:00am) - Gazette 2023/125
2020/19624/11/2020Wholesale Electricity Market Amendment (Tranche 1 Amendments) Rules 2020

Schedule A - 25/11/2020 (8:00am)

Schedule B, Part 1 - 01/01/2021 (8:00am)

Schedule B, Part 2 - 01/02/2021 (8:00am)

Schedule C - 01/10/2021 (8:00am)

2020/11130/06/2020Wholesale Electricity Market Amendment (Distributed Energy Resources Register and Roadmap Implementation - Costs) Rules 202001/07/2020 (8:00am)
2020/10826/06/2020Wholesale Electricity Market Amendment (Technical Rules Change Management) Rules 202001/01/2021 (8:00am)
2020/9516/06/2020Wholesale Electricity Market Amendment (Constraints Framework and Governance ) Rules 202001/07/2020 (8:00am)
2020/2421/02/2020Wholesale Electricity Market Amendment (Reserve Capacity Pricing Reforms) Rules 2019

22/02/2020 (8:00am)

01/10/2021 (8:00am)

2019/15122/10/2019Wholesale Electricity Market Amendment (AEMO to provide information to the Minister) Rule 201901/11/2019 (8:00am)
2018/10129/06/2018Wholesale Electricity Market Rules Amending Rules 2018 (No.3)29/06/2018 (1:00pm)
2018/9927/06/2018Wholesale Electricity Market Rules Amending Rules 2018 (No.2)29/06/2018 (8:00am)
2018/6027/04/2018Wholesale Electricity Market Rules Amending Rules 201828/04/2018
2017/13230/06/2017Wholesale Electricity Market Rules Amending Rules 2017 (No.3)01/07/2017
2017/13029/06/2017Wholesale Electricity Market Rules Amending Rules 2017 (No.2)30/06/2017
2017/12523/06/2017Wholesale Electricity Market Rules Amending Rules 201724/06/2017
2016/22209/12/2016Wholesale Electricity Market Rules Amending Rules 2016 (No.4)10/12/2016
2016/20925/11/2016Wholesale Electricity Market Rules Amending Rules 2016 (No.3)26/11/2016
2016/11630/06/2016Wholesale Electricity Market Rules Amending Rules 2016 (No.2)01/07/2016
2016/8931/05/2016Wholesale Electricity Market Rules Amending Rules 2016

Schedule A - 01/07/2016

Schedule B, Part 1 - 01/06/2016

Schedule B, Part 2 - 01/10/2016

Schedule B, Part 3 - 01/10/2017

Schedule B, Part 4 - At a time specified by the Minister in a notice published in the Gazette

2015/17927/11/2015Wholesale Electricity Market Rules Amending Rules 201530/11/2015

 

Commenced

A list of Rule Change Proposals that were successfully implemented.
ID Date Submitted Title Submitted by Date commenced
RC_2014_03 27/11/2014 Administrative Improvements to the Outage Process Independent Market Operator 29/06/2021
RC_2017_02 04/04/2017 Implementation of 30-Minute Balancing Gate Closure Perth Energy 1/12/2020
RC_2019_05 25/10/2019 Amending the Minimum STEM Price definition and determination Synergy 07/08/2020
RC_2018_05 27/09/2018 ERA access to market information and SRMC investigation process Economic Regulation Authority 21/07/2020
RC_2019_04 18/11/2019 Administrative Improvements to Settlement AEMO 02/07/2020
RC_2020_03 13/05/2020 Estimates for GIA facilities Alinta Energy 24/06/2020
RC_2020_01 24/01/2020 Market Participant Fee calculation manifest error Rule Change Panel 30/03/2020
RC_2013_15 24/12/2013 Outage Planning Phase 2 - Outage Process Refinements Independent Market Operator 01/02/2020
RC_2015_03 27/03/2015 Formalisation of the Process for Maintenance Applications Independent Market Operator 01/10/2019
RC_2018_06 26/11/2018 Full Runway Allocation of Spinning Reserve Costs Public Utilities Office 01/09/2019
RC_2015_01 03/03/2015 Removal of Market Operation Market Procedures Independent Market Operator 01/08/2019
RC_2014_06 28/01/2015 Removal of Resource Plans and Dispatchable Loads Independent Market Operator 01/07/2019
RC_2014_07 22/12/2014 Omnibus Rule Change Independent Market Operator 11/01/2019 and 01/07/2019
RC_2018_07 14/12/2018 Removal of constrained off compensation for Outages of network equipment Public Utilities Office 01/07/2019
RC_2017_06 17/07/2017 Reduction of the prudential exposure in the Reserve Capacity Mechanism AEMO 01/08/2018 and 01/06/2019
RC_2018_04 20/08/2018 Manifest Error in the Deferral of Dates for the 2018 Reserve Capacity Cycle Rule Change Panel 18/10/2018
RC_2018_01 24/04/2018 New Notional Wholesale Meter Manifest Error Rule Change Panel 01/09/2018
Notice of Corrigenda 24/04/2018 Notice of Corrigenda - Market Rules and GSI Rules - 2018_04_24 Rule Change Panel 24/04/2018
RC_2018_02 19/02/2018 K and U parameters in Relevant Level Methodology for 2018 Reserve Capacity Cycle AEMO 27/03/2018
RC_2017_05 07/07/2017 AEMO Role in Market Development AEMO 23/03/2018
RC_2017_10 18/01/2018 Correction of Gazettal Errors Rule Change Panel 20/03/2018
RC_2013_21 10/01/2014 Limit to Early Entry Capacity Payments Independent Market Operator  13/10/2017
RC_2017_01 20/04/2017 Reserve Capacity Mechanism - Manifest Errors 2017 Public Utilities Office 01/10/2017
RC_2017_04 15/08/2017 Reserve Capacity Mechanism - Minor Changes 2017 Public Utilities Office 01/10/2017
RC_2017_07 17/07/2017 Reserve Capacity Mechanism - Transitional Rules AEMO 01/09/2017
RC_2017_03 01/05/2017 Change the Publication Date for Relevant Level Information AEMO 31/05/2017
RC_2015_05 30/03/2015 Specific Transition Provisions for the 2015 Reserve Capacity Cycle Independent Market Operator 01/09/2015
RC_2015_04 15/04/2015 Documentation of the Long Term PASA for the 2014 Reserve Capacity Cycle Independent Market Operator 01/05/2015
RC_2014_04 30/06/2014 Specific Transitional Provisions for the 2014 Reserve Capacity Cycle Independent Market Operator 01/11/2014
RC_2013_18 11/11/2013 Market Rule changes arising due to the merger of the Electricity Retail Corporation and Electricity Generation Corporation Independent Market Operator 30/12/2013 and 01/01/2014
RC_2013_17 22/11/2013 Correction to estimated output of Intermittent Generation for purposes of Appendix 9 Alinta Energy 01/05/2014
RC_2013_11 14/05/2013 Selection of the 12 Peak Trading Intervals used for Calculation of IRCR Independent Market Operator 23/09/2013
RC_2013_08 21/05/2013 Market Participant Fees - Clarification of GST Treatment  Independent Market Operator 01/01/2014
RC_2013_07 10/09/2013 Correction of Minor, Typographical and Manifest Errors Independent Market Operator 25/11/2013
RC_2013_06 27/03/2013 Exclusion of LFAS Quantities from Daily Ancillary Service Files Independent Market Operator 15/05/2013
RC_2013_05 14/08/2013 LoadWatch, EOI and RDQ Provision Independent Market Operator 02/09/2013
RC_2013_03 10/04/2013 LFAS Facility Definition Independent Market Operator 01/06/2013
RC_2013_02 17/06/2013 Clarification of the Minimum TES Calculation Independent Market Operator 01/08/2013
RC_2013_01 12/04/2013 Clarification of Dispatch Compliance Obligations Independent Market Operator 01/07/2013
RC_2012_25 21/01/2013 Constrained On/Off Compensation Removal where a Facility is Non-compliant with Dispatch Instructions Independent Market Operator 01/05/2013
RC_2012_24 18/12/2012 Cure Notices and Credit Support Independent Market Operator 01/06/2013
RC_2012_23 14/08/2013 Prudential Requirements Independent Market Operator 01/05/2014
RC_2012_22 11/12/2012 Commitment and De-commitment Notification Requirements System Management 01/09/2013
RC_2012_21 20/11/2012 5-Yearly Review of Planning Criterion Independent Market Operator 01/05/2013
RC_2012_20 21/01/2013 Consideration of Network Constraints for Certified Reserve Capacity Independent Market Operator 01/07/2013
RC_2012_2019 16/11/2012 Constrained On/Off Compensation for Non-Scheduled Generators Independent Market Operator 01/02/2013
RC_2012_2016 16/11/2012 Alignment of Settlement Tolerances and Tolerance Ranges Independent Market Operator 01/11/2013
RC_2012_15 02/10/2012 Four Month Commissioning Test Period for New Generating Systems Independent Market Operator 01/03/2013
RC_2012_12 25/07/2012 Commissioning Test Plans Independent Market Operator 01/04/2013
RC_2012_11 03/07/2012 Transparency of Outage Information Independent Market Operator 01/10/2013
RC_2012_09 27/07/2012 Clarification and Calculation of Availability Curve System Management 01/11/2013
RC_2012_08 01/06/2012 Constrained On and Off Prices for Non-Scheduled Generators Independent Market Operator 01/07/2012
RC_2012_07 20/11/2013 Loss Factor Determination Independent Market Operator 20/05/2013
RC_2012_06 07/11/2012 Clarification of Reviewable Decisions and Definitions of Regulations Independent Market Operator 01/06/2013
RC_2012_05 18/04/2012 Treatment of Negative Balancing Price on Settlement of Ancillary Services Verve Energy 01/07/2012
RC_2012_04 24/04/2012 Consequential Outage Definition Independent Market Operator 01/09/2012
RC_2012_03 27/03/2013 Assignment of Capacity Credits to Network Control Services Facilities  Independent Market Operator 12/08/2013
RC_2012_01 29/02/2012 Intermittent Loads Eligibility Criteria Independent Market Operator 01/08/2012
RC_2011_14 20/01/2012 Calculation of Availability Class Quantity Correction Independent Market Operator 06/06/2012
RC_2011_13 24/10/2011 Heads of Power for MRCP Market Procedure Independent Market Operator 01/01/2012
RC_2011_12 24/10/2011 Extensions to Procedure Change Process Timelines Independent Market Operator 01/01/2012
RC_2011_11 03/01/2012 Correction of Minor, Typographical and Manifest Errors Independent Market Operator 01/03/2012
RC_2011_10 23/09/2011 Competitive Balancing and Load Following Market Independent Market Operator 01/07/2012
RC_2011_08 14/07/2011 Curtailable Load Dispatch for NCS and Changes to the RCOQ for Curtailable Loads under certain circumstances System Management 01/12/2011
RC_2011_07 14/07/2011 Calculation of Net STEM Shortfall for Scheduled Generators Alinta 01/12/2011
RC_2011_06 19/08/2011 Correction of Minor, Typographical and Manifest Errors Independent Market Operator 01/11/2011
RC_2011_05 09/06/2011 Curtailable Load Dispatch Clarification System Management 01/11/2011
RC_2011_04 13/06/2011 List of Entities Meeting the Acceptable Credit Criteria Independent Market Operator 01/11/2011
RC_2011_02 10/03/2011 Reassessment of Allowable Revenue during a Review Period Economic Regulation Authority 01/07/2013
RC_2010_36 29/10/2010 Acceptable Credit Criteria Synergy 01/04/2011
RC_2010_35 17/11/2010 Use of Forecasts in SRC Assessment Independent Market Operator 01/02/2011
RC_2010_34 22/11/2010 Provision of Commissioning Information by System Management Independent Market Operator 01/01/2011
RC_2010_33 17/12/2010 Cost_LR Verve Energy 01/11/2011
RC_2010_31 18/03/2011 De-Registration of Rule Participants who no longer meet registration requirements Independent Market Operator 01/03/2012
RC_2010_29 02/12/2010 Curtailable Loads and Demand Side Programs Independent Market Operator 01/12/2011
RC_2010_28 01/03/2011 Capacity Credit Cancellation Independent Market Operator 01/07/2012
RC_2010_26 20/09/2010 Minor, Typographical and Manifest Errors Independent Market Operator 01/12/2010
RC_2010_25 29/01/2010 Calculation of the Capacity Value of Intermittent Generation - Methodology 1 (Independent Market Operator) Independent Market Operator 01/01/2012
RC_2010_24 03/08/2010 Adjustment of Relevant Level for Intermittent Generation Capacity Alinta 01/07/2011
RC_2010_23 03/08/2010 Consequential Outage – Relief from capacity refund and unauthorised deviation penalties Alinta 01/05/2011
RC_2010_22 18/11/2010 Partial Commissioning of Intermittent Generators Independent Market Operator 01/10/2011
RC_2010_21 15/10/2010 Excluding Providing Price Related Standing Data to System Management Independent Market Operator 01/05/2011
RC_2010_20 08/10/2010 Market Fees Independent Market Operator 01/05/2011
RC_2010_19 25/10/2010 Settlement Cycle Timeline Independent Market Operator 01/05/2011
RC_2010_18 18/06/2010 Change of Review Board name Independent Market Operator 01/09/2010
RC_2010_16 30/06/2010 Updates to Reserve Capacity Obligation Provisions Independent Market Operator 01/09/2010
RC_2010_15 18/05/2010 MAC Membership Review Perth Energy 01/11/2010
RC_2010_14 06/12/2010 Certification of Reserve Capacity Independent Market Operator 01/01/2012
RC_2010_12 07/11/2010 Required Level and Reserve Capacity Security Independent Market Operator 01/10/2011
RC_2010_11 15/10/2010 Removal of Network Control Services Expression of Interest and Tender Process from the Market Rules Independent Market Operator 01/07/2011
RC_2010_10 17/05/2010 Bilateral Submission Window Verve Energy 01/10/2010
RC_2010_06 27/04/2010 Application of Spinning Reserve to Aggregated Facilities Griffin Energy 01/04/2011
RC_2010_04 07/04/2010 Settlement in Default Situations Independent Market Operator 01/10/2010
RC_2010_03 02/03/2010 Calculation of Net STEM Shortfall Independent Market Operator 01/04/2010
RC_2010_02 07/04/2010 Correction of Chapter 4 minor, typographical and manifest errors Independent Market Operator 01/07/2010
RC_2010_01 12/02/2010 Annual Review of Margin Values Verve Energy 01/07/2010
RC_2009_41 20/11/2009 Removal of Appendix 8- "Top-up and Spill Rules" Independent Market Operator 20/01/2010
RC_2009_40 12/11/2009 Provision of Load Following Ancillary Service System Management 01/05/010
RC_2009_37 14/05/2010 Equipment Tests System Management 01/02/2011
RC_2009_35 21/12/2009 Energy Price Limits Methodology and Consultation Process Independent Market Operator 01/06/2010
RC_2009_30 22/10/2009 Correction of Minor and Typographical Errors Independent Market Operator 18/12/2009
RC_2009_29 26/08/2009 Determination of Capacity Shortfalls for Curtailable Loads Independent Market Operator 01/10/2009
RC_2009_28 17/07/2009 Market Advisory Committee Constitution and Operating Practices Independent Market Operator 15/01/2010
RC_2009_26 20/07/2009 Heads of Power for Market Procedures Independent Market Operator 24/08/2009
RC_2009_24 20/07/2009 Market Procedure Change Process Timelines Independent Market Operator 01/10/2009
RC_2009_23 15/07/2009 System Management Review Period Budget Coverage Amendment Economic Regulation Authority 30/11/2009
RC_2009_22 15/10/2009 The use of tolerance levels by System Management System Management 01/12/2010
RC_2009_21 11/06/2009 Treatment of Negative MCAP on the Settlement of Ancillary Services Verve Energy 01/02/2010
RC_2009_20 01/05/2009 Opportunistic Maintenance outage approval timeframe System Management 01/11/2009
RC_2009_19 11/06/2009 Reserve Capacity Performance Monitoring Independent Market Operator 01/11/2009
RC_2009_18 05/05/2009 Reserve Capacity Refund Price Calculation Independent Market Operator 01/10/2009
RC_2009_17 05/05/2009 Transparency of capacity Credit Allocation Independent Market Operator 01/03/2010
RC_2019_16 21/04/2009 Correction of Minor and Typographical Errors Independent Market Operator 06/07/2009
RC_2009_15 25/03/2009 Removal of Economic Regulation Authority Time Limit to Publish Investigation Results Economic Regulation Authority 01/11/2013
RC_2009_13 12/03/2009 Timing Flexibility for Transfer of Information from System Management System Management 01/08/2009
RC_2009_12 13/03/2009 Definition of a Power System Operating Procedure Independent Market Operator 17/04/2009
RC_2009_11 13/03/2009 Changing the Window of Entry into the Reserve Capacity Mechanism Independent Market Operator 01/12/2009
RC_2009_10 21/04/2009 Early Certified Reserve Capacity Independent Market Operator 01/02/2010
RC_2009_09 16/02/2009 Exemption from Real-time Compliance Monitoring for Certain Commissioning Units System Management 18/03/2009
RC_2009_08 21/04/2009 Updates to Commissioning Provisions Independent Market Operator 01/01/2011
RC_2009_07 17/03/2009 Under Construction for the Reserve Capacity Mechanism Independent Market Operator 01/11/2009
RC_2009_05 17/03/2009 Confidentiality of Accepted Outages System Management 17/08/2009
RC_2009_04 20/02/2009 Approval of Proposed New, Amended, and Replacement Market Procedures Independent Market Operator 27/04/2009
RC_2009_03 18/02/2009 Provision of Intermittent Generator Forecast Information System Management 01/07/2009
RC_2009_02 22/01/2009 Updates to Protected Provisions Independent Market Operator 27/04/2009
RC_2009_01 22/01/2009 Correction of Minor and Typographical Errors Independent Market Operator 27/04/2009
RC_2008_40 12/12/2008 Notification of Synchronisation and Desynchronisation Independent Market Operator 01/02/2009
RC_2008_38 12/12/208 Least Cost Determination of Ancillary Service Contracts System Management 01/06/2009
RC_2008_33 11/09/2008 Compliance Standard of Performance and Reporting Independent Market Operator 16/02/2009
RC_2008_32 02/10/2008 Calculation of IRCR Independent Market Operator 01/05/2009
RC_2008_30 11/09/2008 Reserve Capacity Security Independent Market Operator 01/02/2009
RC_2008_29 11/09/2008 Change to Curtailable Load De-registration Timeframe Independent Market Operator 01/02/2009
RC_2008_28 11/09/2008 Eligible Services for Supplementary Reserve Capacity Independent Market Operator 01/02/2009
RC_2008_27 28/08/2008 Funding of Supplementary Reserve Capacity Independent Market Operator 01/01/2009
RC_2008_26 28/08/2008 Consistency Between Clauses 4.12.1 and 4.26.2 of the Market Rules Independent Market Operator 01/01/2009
RC_2008_25 20/08/2008 Intermittent Load Refund Maximum Independent Market Operator 01/02/2009
RC_2008_24 20/08/2008 Commissioning Tests for Intermittent Generators Independent Market Operator 01/02/2009
RC_2008_23 04/06/2008 LNG to be Added to Liquid Fuel Definition NewGen Neerabup 01/11/2008
RC_2008_21 04/06/2008 Local Black Start Procedures System Management 01/11/2008
RC_2008_20 17/07/2008 Demand Side Management - Operational Issues Independent Market Operator 01/03/2009 (8:00am)
01/10/2009 (8:00am)
01/10/2010 (8:00am)
01/10/2011 (8:00am)
RC_2008_19 21/05/2008 Correction of References and Minor Drafting Errors Independent Market Operator 01/08/2008
RC_2008_18 04/06/2008 Delegation by Independent Market Operator Independent Market Operator 18/11/2008
RC_2008_17 10/04/2008 Commissioning Tests and the Reserve Capacity Mechanism Independent Market Operator 01/09/2008
RC_2008_15 10/04/2008 Delay of Resource Plan Submissions Independent Market Operator 20/08/2008
RC_2008_14 10/06/2008 Information from Network Operators Independent Market Operator 01/11/2008
RC_2008_13 05/03/2008 Economic Regulation Authority's Budget Economic Regulation Authority 15/05/2008
RC_2008_12 14/02/2008 Dispatch Support Ancillary Services System Management  20/04/2008
RC_2008_11 28/02/2008 Maximum Reserve Capacity Price Independent Market Operator 06/08/2008
RC_2008_10 19/02/2008 Capacity Credits and Facility Aggregation Independent Market Operator 01/07/2008
RC_2008_09 20/02/2008 NTDL New and Overnight Loads Griffin Energy 01/05/2008
RC_2008_08 25/02/2008 Indisputable Market Prices Independent Market Operator 10/07/2008
RC_2008_07 28/02/2008 Energy Price Limits Methodology Independent Market Operator 01/08/2008
RC_2008_06 15/02/2008 Reduction of Capacity Credits TransAlta 10/07/2008
RC_2008_05 04/01/2007 Calculation of MCAP Verve Energy 20/03/2008
RC_2008_04 07/01/2008 Standing Data Compliance Monitoring System Management 24/06/2008
RC_2008_03 07/01/2008 Provision of Information for ST and MT PASA System Management 26/05/2008
RC_2008_02 07/01/2008 ST PASA Fuel Supply Issues Notification System Management 26/05/2008
RC_2008_01 07/01/2008 Capacity Test Notification to the Independent Market Operator System Management 26/05/2008
RC_2007_36   Maximum Refund Independent Market Operator 01/06/2008
RC_2007_31   High Risk And Emergency Operating States Definition System Management 02/05/2008
RC_2007_28   SWIS Reliability Planning Criteria Independent Market Operator 10/04/2008
RC_2007_26   Alternative Maximum STEM Price - Monthly Adjustments Independent Market Operator 21/12/2007
RC_2007_24   Maximum Reserve Capacity Price Methodology and Review Independent Market Operator 18/12/2007
RC_2007_22   Network Control Service Procurement Requirements Western Power 01/12/2007
RC_2007_21   STEM Notification of Plant Availability Verve Energy 01/12/2007
RC_2007_20   Correction of References and Minor Drafting Errors Independent Market Operator 01/11/2007
RC_2007_19   Non Temperature Dependant Loads Timelines Premier Power 01/02/2008
RC_2007_18   Reserve Capacity Testing Payments Independent Market Operator 01/02/2008
RC_2007_17   Amendment to Business Day Convention Synergy 01/11/2007
RC_2007_16   Outage Notification to the Independent Market Operator System Management 04/10/2007
RC_2007_15   Provision of Information to the Independent Market Operator System Management 04/10/2007
RC_2007_13   Release of STEM Submission Information Economic Regulation Authority 01/03/2008
RC_2007_11   IRCR for New Meters – Customer Peak Load Diversity Alinta 01/09/2007
RC_2007_10   Intermittent Generator Resource Plan Exemption Synergy 01/02/2008
RC_2007_08   Calculation of Reserve Capacity Refund Independent Market Operator 01/11/2007
RC_2007_07   Discretion of Independent Market Operator to Decide whether to Issue Warning Independent Market Operator 20/11/2007
RC_2007_06   STEM Timeline Flexibility Independent Market Operator 25/10/2007
RC_2007_05   Reserve Capacity Refund Shortfall Formula Independent Market Operator 01/07/2007
RC_2007_04   Requirements for Registration as a Market Participant Synergy 15/10/2007
RC_2007_03   Treatment of DSM in Outage Planning and PASA System Management 01/10/2007
RC_2007_02   Intermittent Generator Downward Dispatch Amendment Alinta 01/10/2007
RC_2007_01   Synchronisation Approval System Management 10/05/2007